11 October 2026•1 min read•EkoDemy Academic Desk
TRISHNA — ISRO–CNES Thermal Infra-Red Satellite in Advanced Stage, Launch in 12–16 Months
ISRO–CNES TRISHNA satellite (thermal infra-red, water and land-surface temperature) is in advanced realisation; PSLV launch expected in 12–16 months.
Key Topic Tags