Current Affairs11 Oct 2026
TRISHNA — ISRO–CNES Thermal Infra-Red Satellite in Advanced Stage, Launch in 12–16 MonthsISRO–CNES TRISHNA satellite (thermal infra-red, water and land-surface temperature) is in advanced realisation; PSLV launch expected in 12–16 months.
#India France Space#ssc#ISRO
Read Study Note